Weekly Shipping News - JiuFang Logistics (22nd, Nov ~ 29th, Nov)
1. Ex China to USA By Sea:
- The shipping rates are skyrocketed this week.
- LA/LB port is still on serious congestion,it may cost 10-20 days for the vessel being on berth.
- ZIM Line will omit all of the vessel ex Shenzhen, China to Los Angeles in December,2021.
- The shipping space ex China to USA will be surely in tight, Please book the shipping space in advance.
*****The real transit time from China to USA these months as below:
Shenzhen, China to Los Angeles Seaport |
|||||
Carrier Name: |
Transit Time by sea |
Unloading time |
Pick-up time |
Unstuffing time |
Full Leading Time |
MATSON |
10–17 |
1–10 |
0–6 |
0–2 |
11–35 |
ZIM |
14–25 |
12–21 |
7 |
0–3 |
33–56 |
CMA |
10–26 |
1–7 |
0–4 |
0–1 |
11–42 |
COSCO |
21–32 |
1–2 |
8 |
0-5 |
35–53 |
EMC |
13–22 |
1–2 |
0–4 |
0–2 |
14–30 |
OOCL |
18–22 |
1 |
4 |
5 |
28–32 |
HMM |
40 |
12–18 |
7 |
1 |
55–66 |
MSC |
42 |
2–5 |
3–5 |
1 |
48–53 |
HPL |
40 |
11 |
3–7 |
0–3 |
54–64 |
ONE |
20-31 |
20 |
3–7 |
0–3 |
43–63 |
WHL |
16 |
12–18 |
3–7 |
0–3 |
31–44 |
2. China to USA by air:
The airway rates ex China to USA is still going up, and the space is limited also.
Lead time: 7-12 working days.
3. Ex China to EU:
Both the airway and seaway rates will be increased due to the peak season coming.
4. Ex China to Canada:
- Serious Port congestion: Vancouver/Toronto
- Pretty full Warehouses
The breakdown in Canadian Airport is still very slow due to the airport problem: lack of manpower and Covid-19 issues.
We’re doing our best to figure out the solution. Airway rates to Canada are going up and shipping space is limited. Please consult us case by case if you get any shipments.
5. Ex China to Australia by Sea:
Australia’s ongoing port congestion has left transport operators fuming over mounting container detention charges.
6. Ex China to Japan by Air:
There’re many flights have been canceled these weeks ex Qingdao,China to Japan.
7. International Courier:
There’re many Customs inspection cases by Shenzhen Customs this week.The lead time will be a bit delayed. The Courier rates may be increased in this week due to many flights canceled.
It will cost around 5-10 days ex China to USA, EU.